| SEARCH |
• Air Compressor Service New York
|
![]() Commissioned: Partnered with an HVAC Manufacturer/Contractor Date: 3/23/2011 – 3/25/2011 Location: Major College on Long Island, New York Services Provided: Laser Alignment, Motor Upgrade, Motor Base Retrofit, and parallel shaft coupling replacement. Background: KG Power Systems was contacted by an HVAC Contractor on February 22, 2010 to help them replace and upgrade 24 centrifugal pump motors, ranging from 3 HP to 100 HP, at three college campuses on Long Island, New York. The HVAC Manufacturer felt that it was in their best interest to Sub-Contract the repair work as their comparative advantage lies in complete sales and not in repair work. Motor and Pump Connection: Some of the units had soft foot problems (motor bases were broken, rotting or chipped causing the motor to become misaligned and/or vibrate) causing increased and uneven wear on the shaft couplings. To repair the soft foot problem, K&G retrofitted new motor bases, allowing for a suitable area to mount the new premium efficient motors. To ensure the motor end coupling and the pump end coupling were aligned properly; KG Power Systems used a laser aligner to ensure a perfectly straight and aligned connection. This is very important, because if the couplings are misaligned the coupling connector will wear quickly causing increased downtime. The motor also becomes damaged overtime as the bearings take on un-traditional forces, causing uneven wear and shaft damage. Motor Upgrade: All standard efficient motors were replaced by premium efficient motors. Misaligned Symptoms: Rubber dust from a worn coupling insert after 2 months of operation. Shaft and Bearing Damage Caused by Misalignment: Please Contact Irene for more information about this job or laser alignment: Ph. 631-342-1171 or Irene@kgpowersystems.com DOCUMENT DOWNLOADS |

